Treat your renovation like a small capital project: define outcomes, lock the scope, price to market, follow state rules, and plan the sequence. Without that structure, budgets blow out, and timelines drift.
In December 2024, the Australian Bureau of Statistics recorded $1.106 billion in approvals for residential alterations and additions. CoreLogic’s March quarter 2025 data shows 94.9% of resales made a nominal profit, so targeted maintenance and upgrades clearly support saleability.
Set the Outcome First, Not the Fixtures
Decide what success looks like before you pick a single tile or tap. Set three hard limits upfront: total budget range, completion date, and two measurable wins, such as 20% more storage or 30% lower lighting energy.
Pick the Right Upgrade Type
- Cosmetic refresh: paint, new hardware, and lighting with minimal trades
- Replacement: swap cabinetry or appliances with moderate lead times
- Structural: move walls or services that need permits and engineering
Each tier has different downtime, approvals, and risk exposure. I recommend a 10 to 15% contingency for unknowns, regardless of which path you choose.
Lock a Tight Scope You Can Price
A detailed scope keeps your budget in check and forces like for like pricing from contractors. Build a two column list of must haves versus nice to haves, with unit counts such as square metres of paint and number of light points.
Identify Risks Before Pricing
Flag hidden risk items early, such as waterproofing issues, subfloor repairs, and switchboard capacity for induction or heat pumps. Homes built before 1990 are more likely to contain asbestos, according to the Asbestos Safety and Eradication Agency. Plan testing or allowances for moisture, termite damage, or non-compliant electrical work.
Reality Check the Budget With Current Market Ranges
Realistic price expectations help you assess quotes with confidence and avoid nasty surprises. Add a 5 to 8% escalation buffer for quotes older than 90 days.
Bathroom and Painting Guides
Include demolition, waterproofing, tiling, fixtures, electrical, and ventilation in bathroom budgets. Waterproofing should be tested and documented before tiling. Australian guides indicate interior painting rates roof ughly $20 to $40 per square metre and exterior rates of about $15 to $60, depending on prep, access, and coatings.
Pass the Compliance Checks Upfront
Understanding compliance prevents unlawful work and payment risks before you sign anything.
Victoria Essentials
Victoria’s Domestic Building Contracts Act 1995 requires a major domestic building contract for most work over $10,000. Deposits are capped at 10% for contracts under $20,000 and 5% for contracts of $20,000 or more. Electricians must be licensed by Energy Safe Victoria and provide a Certificate of Electrical Safety after installation work.
South Australia Licensing
In South Australia, anyone contracting to perform building work must hold a building work contractor’s licence issued by Consumer and Business Services. Use the SA Government public register to verify licences before engagement.
Hire Like a Risk Manager
A repeatable screening process reduces contractor risk before you compare prices. Verify licences, insurance, and domestic building insurance where applicable.
Reference Checks and Red Flags
Request three comparable recent jobs within 12 months with contactable references. Ask about punctuality, how variations were handled, and how quickly defects were fixed. Walk away from quotes loaded with large provisional sums, which are vague allowances instead of fixed prices, refusal to provide certificates, or pressure to pay early.
A Compliant Kitchen Upgrade End to End
Here is how a typical compliant Melbourne kitchen upgrade runs from first sketch through to handover.
Example Scope and Inclusions
Consider a layout change to improve flow and storage, and confirm switchboard capacity for induction. Specify carcass materials, hardware, edge treatments, and stone thickness. Confirm splashback type and compliance clearances upfront.
Permits and Certificates
Structural works may require a building permit and engineering sign off. Licensed electricians must issue a Certificate of Electrical Safety. Licensed plumbers issue compliance certificates where applicable.
Quality Checks Before Handover
Measure cabinet reveals and door alignment. Confirm soft close mechanisms and clearances work properly. Check benchtop joints, cut outs, sealing, service isolation tags, and collect user manuals at handover. If you are in Melbourne and want a design to handover specialist for a full kitchen upgrade, consider Mint Kitchen Group and explore kitchen renovations Melbourne for recent projects and process clarity.
Repaint for Saleability or Maintenance
A professional repaint is a fast way to refresh presentation or protect exteriors, but licensing and a clear scope are non negotiable in SA. Clear records also help future owners safely understand what was done.
What to Include in Your Scope Pack
List substrates by room and exterior zones with specific primers and topcoats. Set sheen levels for walls, trim, and wet areas. Nominate brand lines to avoid substitutions that compromise quality.
Why Prep Time Moves the Price
Detail patch counts, gap filling, and stain blocking requirements. Note access constraints and scaffold needs early. Prep work is the main cost driver, so agree allowances in advance.
SA Compliance for Painting Contractors
Contractors must hold a building work contractor’s licence issued by Consumer and Business Services. Use the SA Government public register to confirm licence class and status before engagement. If you want a licensed, warranty backed local team for interior or exterior repainting, AJ Blunt Painting serves greater Adelaide and you can compare quotes to set scope, coatings, and warranty terms with painters in Adelaide.
Contracts, Deposits, and Stage Payments
A payment structure that matches legal requirements keeps cash flow tied to progress. Follow state rules on deposits and pay only for completed stages so you never fund work twice or face avoidable disputes. Never front load payments beyond work done.
Your contract should include drawings, inclusions and exclusions, programme, staged payments, site hours, dust control, waste removal, and defects process. Certificates due at handover include electrical, plumbing, waterproofing evidence, warranties, and manuals.
Conclusion
The core process is straightforward: define outcomes, lock the scope, price to market, pass compliance checks, hire carefully, and follow a clear program. Verify licences, capture any rebates, and insist on certificates and warranties at handover. With a tight scope and the right partners, upgrades become predictable and genuinely value adding.
FAQs
What approvals should I check before starting a typical kitchen refresh in Victoria?
Confirm whether the work triggers a major domestic building contract threshold and provide the Domestic Building Consumer Guide before signing. If structural changes are planned, speak with a registered building surveyor about permits.
How do I estimate paint quantities for a coastal Adelaide home?
Estimate wall areas by multiplying length by height and subtract large openings, then add 10% for waste. For coastal exposure, favour systems rated for salt and UV resistance with primers suited to the substrate.
What is the safest way to check for asbestos before small DIY jobs?
If your home was built before 1990, assume asbestos may be present and do not disturb materials until tested. Use a licensed assessor and never cut, sand, or pressure wash suspect materials.
For an investment property, which costs are deductible now versus claimed over time?
Repairs that restore the asset to its original condition are usually deductible immediately. Improvements and initial repairs are capital works or depreciable plant, so keep costs itemised for your accountant.
This foundation of contracts, budgeting, and risk checks also applies when you repaint. The next Adelaide example walks through a scoped, licensed repaint so you can see how the planning translates on site.